GCB-E100 Commercial & Industrial Energy Storage System

[GCB-E100: ALL-IN-ONE 50KW/100KWH C&I BESS]

50kW AC / 100.35kWh nominal (up to 112.53kWh usable). Battery modules + BMS + EMS + HVAC + FSS in single IP54 cabinet (~1200x803x2375mm, ~1300kg). Grade A 280Ah or 314Ah LFP prismatic cells, 6,000+ cycles at 80% DOD. 50kW three-phase 380V inverter. Three modes: Grid-tied / Off-grid / Hybrid. Factory pre-commissioned. CE, RoHS, ISO9001, IEC 62619, UL 1973. 5-year warranty. Configurable to site.
Availability:
Quantity:
  • GCB-E100

  • E-ABLE POWER

  • GCB-E100

E-ABLE POWER
COMMERCIAL ENERGY STORAGE SOLUTIONS
COMMERCIAL & INDUSTRIAL 50kW / 100kWh ALL-IN-ONE FULLY CONFIGURABLE
GCB-E100 SERIES | ALL-IN-ONE C&I BESS CABINET

GCB-E100 Commercial & Industrial Energy Storage System

A factory-integrated 50kW/100kWh all-in-one BESS cabinet combining battery modules, BMS, EMS, HVAC, and fire suppression system in a single IP54 enclosure. Engineered for peak shaving, solar self-consumption, backup power, TOU arbitrage, and microgrid applications. Every system is configured to site requirements — capacity, operating mode, protection design, and integration interfaces are confirmed per project.

E-Able Power GCB-E100 commercial industrial energy storage cabinet — 50kW 100kWh all-in-one LFP BESS

Key Specifications at a Glance

• AC Power: 50kW — Three-Phase 380V AC• Nominal Capacity: 100.35kWh (up to 112.53kWh Usable)• Battery Cells: Grade A LFP — 280Ah / 314Ah Options• Cycle Life: 6,000+ at 25°C, 0.5C, 80% DOD• Architecture: All-in-One — BESS + BMS + EMS + HVAC + FSS• Enclosure: IP54 — ~1200×803×2375mm — ~1300kg• Operating Modes: Grid-Tied / Off-Grid / Hybrid (Configurable)• Cell Certification: IEC 62619 / UL 1973• Certifications: CE / RoHS / ISO9001 / ISO14001• Warranty: 5 Years Standard
PROJECT-FOCUSED ENERGY STORAGE DESIGN
Integrated All-in-One Cabinet
Factory-assembled enclosure combines battery modules, PCS, BMS, EMS, HVAC and fire suppression — reducing on-site coordination, wiring, and commissioning time vs separate-component systems.
Grid & Backup Planning
Choose grid-tied (peak shaving, TOU, demand management), off-grid (islanded backup), or hybrid (solar-plus-storage) mode — configured to your load profile, tariff structure, and utility interconnection rules.
Engineering Before Delivery
Confirm installation space, cable routes, local codes, fire strategy, ambient conditions, and commissioning scope before order. E-Able Power provides a complete technical proposal within 2–3 business days.
REFERENCE CONFIGURATION & TECHNICAL DATA
The following figures are reference information. Final configuration, compliance documents, and installation conditions are confirmed per project. All parameters configurable to site requirements.
System Reference Specification
AC Power & Capacity 50kW / 100.35kWh nominal (up to 112.53kWh usable) — AC-coupled reference configuration.
Battery Cells Grade A LFP prismatic cells — 280Ah / 314Ah reference options per project requirement.
Cycle Life 6,000+ cycles at 25°C, 0.5C charge/discharge, 80% DOD reference conditions.
AC Interface 50kW three-phase four-wire 380V AC inverter. On-grid, off-grid, and hybrid operation require project validation.
Integrated Subsystems BMS (cell-level monitoring), EMS (energy management), HVAC (thermal control), FSS (fire suppression) — all factory-integrated.
Enclosure IP54 — approx. 1200×803×2375mm — approx. 1300kg. Verify access, foundation, and lifting before order.
HOW TO SELECT THE RIGHT C&I ENERGY STORAGE SYSTEM
Project Input Why It Matters
Load Profile & Tariff Defines power, usable energy, and expected value of peak reduction or energy shifting.
Solar & Utility Connection Determines AC coupling topology, grid connection conditions, export policy, and operating controls.
Backup Loads & Duration Separates essential from non-critical loads for a realistic resilience design.
Site & Compliance Review Confirms indoor/outdoor placement, ventilation, clearances, local approvals, and safety requirements.
PROJECT APPLICATIONS
Factories
Peak shaving, load management, and essential-process backup.
Commercial Buildings
Demand charge reduction for offices, retail, and campuses.
Solar + Storage
Maximize PV self-consumption and dispatch planning.
EV Charging Hubs
Buffer charging peaks and reduce grid upgrade costs.
FREQUENTLY ASKED QUESTIONS

Q: How should we size a commercial energy storage system?

Start with interval load data (15-minute or hourly), the tariff structure (peak/off-peak rates, demand charges), planned solar capacity, required backup loads, and desired operating objective. The GCB-E100 reference configuration (50kW/100kWh) suits sites with peak demand around 40–60kW and 2–4 hours of storage duration. E-Able Power validates sizing against your actual load profile and delivers a complete report within 2–3 business days.

Q: Can this system operate with solar and the grid simultaneously?

Yes. The GCB-E100 supports three operating modes: grid-tied (peak shaving, TOU arbitrage with utility-interactive controls), off-grid (islanded backup with seamless transfer), and hybrid (solar-plus-storage with grid-fallback). The applicable mode, protection coordination, and utility interconnection agreement must be confirmed for the actual project and local grid code. All modes are configurable to site — not locked to a single topology.

Q: What customization options are available for the GCB-E100?

The GCB-E100 is fully configurable to project requirements. Customization options subject to project volume include: cell capacity selection (280Ah or 314Ah LFP), AC output power configuration, cabinet color and OEM branding (logo + housing), integration with third-party inverters and EMS platforms, communication protocol (Modbus TCP/RTU, CAN, IEC 61850), and destination-market certification packages. Contact E-Able Power with your project specification for a customized proposal.

Q: What should be verified before placing an order?

Confirm the final bill of materials, energy capacity, installation location (indoor/outdoor), environmental conditions (ambient temperature, humidity), electrical interface (AC voltage, phase, grid connection), fire-safety clearances per local code, required certificates for the destination market, delivery scope, and commissioning responsibilities. E-Able Power provides a pre-order verification checklist and remote commissioning support via video call. On-site commissioning engineer available for projects above 500 kWh.
QUALITY ASSURANCE & CERTIFICATIONS
ISO
9001
Quality Mgmt
ISO
14001
Environmental
CE
EU Compliance
IEC
62619 Cells
LFP
Safe Chemistry

Factory: Dongguan, Guangdong, China. Cells IEC 62619 / UL 1973 certified. 5-year standard warranty. Project-specific compliance documentation available on request.

RELATED ENERGY STORAGE RESOURCES

Plan Your Site-Appropriate Energy Storage System

Every GCB-E100 is configured to your site — capacity, operating mode, protection design, and integration interfaces are confirmed per project. Send your load profile, utility requirements, solar plan, and backup target for a complete technical proposal within 2–3 business days.

Previous: 
Next: 

Related Articles

content is empty!

E-Able Solar is a prominent Chinese manufacturer of solar-powered street lights, offering a wide range of products that includes All-in-One solar power street lights, All-in-Two solar power street lights, Split Solar Power Street Lights, and Solar Garden Lights...

QUICK LINKS

PRODUCTS

CONTACT US
   +86-15355589600
   tengye.arthur
    sales@e-ablepower.com
   Building C, Huiheng Industrial Park, No. 3 Fenghuang West Road, Shajiao, Humen Town, Dongguan City, Guangdong Province
Copyright © 2023 E-Able Power All rights reserved. Sitemap Support by leadong Privacy Policy