Building C, Huiheng Industrial Park, No. 3 Fenghuang West Road, Shajiao, Humen Town, Dongguan City, Guangdong Province
LiFePO4 Energy Storage Batteries & Systems | E-Able Power
E-Able Power manufactures LiFePO4 energy storage systems in Dongguan, China, from home batteries to megawatt-scale containers, with factory-direct pricing, OEM/ODM and global support. Residential: GWR wall-mounted (5.12–10.24 kWh) and GVR tower (15.36–32.15 kWh) batteries with 6,000+ cycles at 80–90% DoD, cell-level BMS and a 5-year warranty. C&I: GCB-E all-in-one cabinets (GCB-E50 / E100 / E240, 50–241 kWh) for peak shaving, TOU arbitrage and backup. Utility: GCB-C1200 (20 ft, 1.2 MWh) and GCB-C2400 (40 ft, 2.4 MWh) factory-integrated container BESS on a 768 Vdc rack platform. Racks & Modules: GHR-314 rack (241 kWh) and GLR-314 module (16.08 kWh). Inverters: SDPO split-phase hybrid inverters (SDPO-U 7.2 kW; SDPO-IP 10–12 kW) with dual MPPT, 10 ms transfer and UL 1741.
Quality: Grade A 280 Ah / 314 Ah cells; CE, IEC 62619, UL 1973; ISO 9001 / ISO 14001. Service: Partners in 20+ countries receive installation, training and after-sales support in local languages.
[SPLIT PHASE HYBRID INVERTER 7.2-12KW]--E-Able Power SDPO series on/off grid split phase hybrid inverter provides true 120Vac (L1/N, L2/N) and 240Vac (L1/L2) output for North-American-style two-phase grids, homes, small businesses and off-grid cabins. Three models cover every site: SDPO-U-7.2kw Split, SDPO-IP-10kw Split and SDPO-IP-12kw Split. Key features include dual MPPT trackers with up to 6000W plus 6000W PV input, 51.2V LiFePO4 or lead-acid battery compatibility with self-adaptive BMS communication, pure sine wave output, 10ms bypass-to-inverter transfer, and parallel operation up to 6 units for expansion to 72kW. UL 1741 certified, FCC Part 15 Class B, IEEE 1547 grid regulation, with 21 built-in protections and WiFi remote monitoring. Pair with E-Able GWR or GVR batteries for a complete solar plus storage system. Quotation within 2-3 business days.
Brief: [SPLIT PHASE HYBRID INVERTER 7.2-12KW]--E-Able Power SDPO series on/off grid split phase hybrid inverter provides true 120Vac (L1/N, L2/N) and 240Vac (L1/L2) output for North-American-style two-phase grids, homes, small businesses and off-grid cabins. Three models cover every site: SDPO-U-7.2kw Split, SDPO-IP-10kw Split and SDPO-IP-12kw Split. Key features include dual MPPT trackers with up to 6000W plus 6000W PV input, 51.2V LiFePO4 or lead-acid battery compatibility with self-adaptive BMS communication, pure sine wave output, 10ms bypass-to-inverter transfer, and parallel operation up to 6 units for expansion to 72kW. UL 1741 certified, FCC Part 15 Class B, IEEE 1547 grid regulation, with 21 built-in protections and WiFi remote monitoring. Pair with E-Able GWR or GVR batteries for a complete solar plus storage system. Quotation within 2-3 business days.
16.08kWh per module, Grade A 314Ah LFP cells. 2-16 modules in series (32-257kWh/rack), up to 10 racks parallel for 800kW+/2.57MWh. DC voltage: 102.4-819.2Vdc. Module: 838x478x278mm, 125kg, castor wheels. CAN 2.0 / RS485 / RS232 (Modbus RTU). Compatible with Deye, Growatt, Solis, Goodwe, Sol-Ark, SMA, Victron. 6,000+ cycles at 90% DOD. 3-level BMS. CE, IEC 62619. 5-year warranty. Configurable to project.
16.08kWh per module, Grade A 314Ah LFP cells. 2-16 modules in series (32-257kWh/rack), up to 10 racks parallel for 800kW+/2.57MWh. DC voltage: 102.4-819.2Vdc. Module: 838x478x278mm, 125kg, castor wheels. CAN 2.0 / RS485 / RS232 (Modbus RTU). Compatible with Deye, Growatt, Solis, Goodwe, Sol-Ark, SMA, Victron. 6,000+ cycles at 90% DOD. 3-level BMS. CE, IEC 62619. 5-year warranty. Configurable to project.
Patented 3-column stack architecture: up to 45 modules (15/column), 241kWh per rack. Grade A 314Ah LFP cells, 6,000+ cycles at 90% DOD. Configurable DC bus to 768Vdc+. 157A continuous / 314A peak. CAN 2.0 / RS485 / RS232. 3-level BMS. Optional aerosol/perfluorohexanone FSS. Parallel multiple racks for MWh-scale. IP20 indoor. CE, IEC 62619. 5-year warranty scalable to 10 years. Configurable to project.
Patented 3-column stack architecture: up to 45 modules (15/column), 241kWh per rack. Grade A 314Ah LFP cells, 6,000+ cycles at 90% DOD. Configurable DC bus to 768Vdc+. 157A continuous / 314A peak. CAN 2.0 / RS485 / RS232. 3-level BMS. Optional aerosol/perfluorohexanone FSS. Parallel multiple racks for MWh-scale. IP20 indoor. CE, IEC 62619. 5-year warranty scalable to 10 years. Configurable to project.
The GCB-C2400 is our flagship Utility-Scale Containerized Energy Storage System, housed in a robust 40ft High Cube container. Delivering a massive 1,000 kW (1 MW) of power and 2,411 kWh (2.4 MWh) of nominal energy, it seamlessly integrates BESS, BMS, EMS, HVAC, and FSS. Powered by high-capacity Grade A 314Ah LiFePO4 cells engineered for over 6,000 cycles, this system is the ultimate solution for utility-scale microgrids, frequency regulation, renewable integration (PV/Wind), and peak-shaving energy arbitrage.
Brief: The GCB-C2400 is our flagship Utility-Scale Containerized Energy Storage System, housed in a robust 40ft High Cube container. Delivering a massive 1,000 kW (1 MW) of power and 2,411 kWh (2.4 MWh) of nominal energy, it seamlessly integrates BESS, BMS, EMS, HVAC, and FSS. Powered by high-capacity Grade A 314Ah LiFePO4 cells engineered for over 6,000 cycles, this system is the ultimate solution for utility-scale microgrids, frequency regulation, renewable integration (PV/Wind), and peak-shaving energy arbitrage.
E-Able Solar is a prominent Chinese manufacturer of solar lighting and commercial energy storage systems, offering All-in-One and All-in-Two solar street lights, Split solar street lights, Solar Garden Lights, and C&I to utility-scale LiFePO4 energy storage solutions (50kW to 1MW+).
+86-15355589600 sales@e-ablepower.com Building C, Huiheng Industrial Park, No. 3 Fenghuang West Road, Shajiao, Humen Town, Dongguan City, Guangdong Province